Good to know
The things clients ask us before signing — answered straight.
For renovations, usually within two to three weeks. New builds depend on council approval, but we can begin site establishment as soon as permits are lodged and the contract is signed.
Yes. We price directly from architectural and structural drawings, and we are happy to sit in on design meetings before the drawings are finalised so the budget stays realistic.
The quoted scope is fixed. Costs only change if you change the scope, or if a genuine unforeseen condition is found — and both are issued as written variation orders before work continues.
In most cases yes. We seal off work areas with dust screens, keep at least one bathroom and the kitchen usable where possible, and phase the noisy work.
We lodge and follow up building submissions and arrange the required inspections. Your architect or engineer supplies the drawings we submit.
24 months on workmanship from the date of handover, plus the manufacturers’ warranties on all supplied materials and appliances, collated in your handover file.
Yes — single bathrooms, boundary walls and small repairs all go through our renovations division with the same contract and warranty.
Send us drawings, photos or a description through the quote form. We will arrange a site visit and return a full itemised quotation within 48 hours.
Ready when you are
Send us your plans, a sketch or just an idea. You’ll get a detailed, itemised quote within 48 hours.